2017秋季绿色关税共享可再生能源征集

Latest News & Update

Respondents are encouraged to check this Request for Offers (RFO or the solicitation) Website periodically for updates, notices, 和帖子. SDG&E, 自行决定, 根据CPUC的命令, 可能会更改条款, 本次招标的要求和时间表. Respondents should monitor the RFO Website for announcements regarding any updates or changes including posted questions & answers. SDG&E将张贴所有征集公告, 包括对本网站的时间表更改或《全球十大博彩公司评级》修订. 特别是, participants should check the RFO website for (i) details on the pre-bid conference call and (ii) posting of answers to submitted questions.

SDG&E的2017年秋季RFO寻求绿色关税共享可再生能源计划电力购买协议

根据决定 (D.)16-05-006, D.15-01-051, D.17-07-007 和解决 (R-)4734 (together the GTSR Decisions) issued by the California Public Utilities Commission (CPUC or Commission), 圣地亚哥天然气 & 电力公司(可持续发展目标&E) is issuing this Green Tariff Shared Renewables (GTSR) Program joint RFO seeking contracts with facilities that produce Renewable Portfolio Standard (RPS)-eligible energy for the purpose of implementing its Enhanced Community Renewables and Green Tariff programs, 如下所述. 

GTSR决策授权可持续发展目标&E .实施GTSR计划, 它包括两个部分:(1)绿色关税(GT)计划(EcoChoice), allowing customers to choose a higher percentage of renewable generation than they already get from SDG&E; and, (2)增强社区可再生能源(EcoShare), 允许客户参与社区项目. 

这些程序的目的是:1)使清洁, 可再生能源提供给捆绑公用事业客户, whether they own a home and/or can afford a significant capital investment; (2) increase the overall volume of renewable energy in the San Diego area; and (3) increase options for institutional, 满足商业和住宅客户的可再生能源目标.  总的来说,西班牙&E’s GTSR program is designed to ensure sufficient eligible capacity is available to meet customer demand of up to 59 MW, with 10 MW of the total program capacity being set aside for projects located in designated 环境al Justice (EJ) areas.

SDG&E在2015年举办了一次生态选择征集活动, 并将在2017年和2018年举行两次EcoShare拍卖, or until all available GTSR capacity is reserved subject to customer participation in these programs.  为实现其生态共享目标,可持续发展目标&E将为其EcoShare或EcoChoice项目寻求20兆瓦或更小的报价.  Distributed Energy Resource Providers (DERP) participating in the EcoShare program can aggregate resources to meet the CAISO 0.5兆瓦的最低规模要求投标进入市场.   Offers consisting of DERP resources are eligible to bid into this solicitation provided they meet the other requirements outlined in the EcoShare solicitation document.   本次招标不要求对上网电价项目(如.g. Re-MAT, Bio-MAT), BioRAM, 或目前存在或正在考虑的其他RAM或RPS采购活动.

征集协议:

Details regarding the solicitation process and eligibility requirements are provided in the RFO document below.

所需表格及文件:

  1. Offer Form -可提交的表格数目没有限制. Therefore, 鼓励受访者, 但不是必需的, 提交其他较短租期或有自动扶梯的报价供我们考虑.
  2. Interconnection Agreement or Phase II Interconnection Study (or distribution level equivalent) and / or Fast Track Documentation -提交最近完成的互连协议副本, 第二阶段互连研究或同等快速通道文件.  For Projects located in Imperial Valley and dynamically transferred via pseudo-tie into SDG&E的服务区域由CAISO, submit copies of a completed Phase II interconnection study and provide documentation certifying the existence of the dynamic transfer arrangements.
  3. 现场控制文件 - Submit copies of site control documents demonstrating: a) direct ownership; b) a lease; or c) an option to lease or purchase upon PPA approval (must be an exclusive option to the Bidder that will last until the completion of the RFO cycle).
  4. Site Maps - Submit copies of all project maps showing location, facilities, layout, Interconnection, etc. 项目单线图.
  5. 资源报告 -请提交可核实的燃料资源计划
  6. 全pv系统模型(仅限太阳能) - the full PVSyst file must be submitted by exporting the entire project that contains the prj, met, inv, pan, etc. files.

参考表格及文件:

本次招标采用不可修改的购电协议(PPA)结构.  These documents are pre-approved by the California Public Utilities Commission (CPUC) and may not be changed by either SDG&E或中标人.  只有空白处可以填写项目的具体信息.  所有答复者应仅根据这些协议的条款提交投标.  

  • GTSR购电协议  (EcoShare和EcoChoice项目);
  • ECR Rider  (对于没有DERP的EcoShare项目),或者
  • ECR DERP附加条款(适用于带有DERP的EcoShare项目)

RFO回应说明:

答辩人必须通过PowerAdvocate®以电子方式提交其报价, 并随附所需表格及投标资料.  所有优惠必须不迟于以下日期上传至PowerAdvocate® 12:00 p.m. (i.e. 太平洋标准时间,2017年11月17日中午.  Offerors intending to submit an Offer but who do not yet have an existing account must first register to create a username/password to receive access to the event. PowerAdvocate®征集网站可在以下网址访问:

http://www.poweradvocate.com/pR.do?okey=73146&pubEvent = true

RFO沟通

All questions or other communications regarding this RFO should be submitted via e-mail to (电子邮件保护) 获取EcoShare产品或 (电子邮件保护) EcoChoice产品.  无论哪种情况,你 MUST CC独立评估师,贝茨怀特律师事务所的弗兰克·莫斯伯格 (电子邮件保护)

SDG&E will not accept questions or comments in any other form, except at the bidder’s Conference.  Question submitted after the deadline as specified in RFO Schedule will only be answered at the sole discretion of SDG&E or the IE.  All questions and their answers will be posted publicly on this website anonymously soon after receipt.  我们不能直接回应或保密任何问题.  Respondents are encouraged to check this RFO Website periodically for updates, notices, 和帖子.

投标人的会议

SDG&E将通过网络会议召开一次投标人会议.  Participation in the conference call is not mandatory for those ultimately submitting a proposal.

When2017年10月23日
Time:下午1:30 - 3:30 PPT
加入webex会议
http://intercall.webex.com/intercall/j.php?MTID=m39d75c57eb2d78e46ede8d8dc09a57e0
会议号码:594 875 127

电话加入
拨入号码:(844)621-8112
会议ID: 1845464

不能参加会议?
http://help.webex.com/docs/DOC-5412

The audio of the bidder’s conference will be posted as soon as possible after the conference.  要访问它,请使用原始事件链接.

2017秋季GTSR时间表

以下时间表和截止日期适用于本RFO.  SDG&E保留在SDG中随时修改此时间表的权利&E自行决定.  Respondents are responsible for monitoring the RFO Website for updated schedules and possible amendments to the RFO or the solicitation process.  有关详细的时间表,请参阅每种产品类型的协议.

NO.

ITEM

DATE

1.

RFO Issued

Oct. 16, 2017

2.

投标人的会议; 1:30 PM to 3:30 PM, PPT

Oct. 23, 2017

3.

提交问题的截止日期

Nov. 8, 2017

4.

所有问题的答案将发布在可持续发展目标上&E’s website

Nov. 13, 2017

5.

提交报价的截止日期/截止日期
优惠必须在下午12点之前上传到PowerAdvocate®.M. (i.e. 正午)太平洋标准时间

Nov. 17, 2017

6.

通知中标人和或有投标人

Jan. 5, 2018

不同商业企业的参与

SDG&E鼓励多元化企业(" DBEs "), “Women-Owned Businesses” or “Minority-Owned Businesses” or “Disabled Veteran Business Enterprises” as defined in G.O. 156[1],以参与此全源RFO. 

此外,西班牙&E encourages developers to utilize DBEs during various stages of project development and construction. 作为G的一部分.O. 156, SDG&E will require developers to identify and verify their DBE contractor/subcontractor spending if any.

关于可持续发展目标的更多信息&E的DBE计划和使用DBE可以在以下网址找到:

http://www.sempra.com/about/supplier-diversity/

http://www.cpuc.ca.gov/puc/supplierdiversity/

SDG&E’s DBE Program representatives will provide a presentation during the bidders’ outreach event.  各发展机构可通过联系可持续发展目标要求获得更多信息&E at (电子邮件保护).

常见问题

  • 2017 GTSR常见问题解答
  • ECR I FAQs
286.78 KB
PDF
常见问题
常见问题
227.51 KB
PDF
更新的常见问题
更新的常见问题
1.50 MB
PDF
投标人会议幻灯片
投标人会议幻灯片
2.23 MB
PDF
生态选择征集协议文件
生态选择征集协议文件